Edit Code Back to DashboardCode Title Post BodyGeneral InformationName of Building OfficialAddressCityStateZIPBuilding Department PhoneInspection Line/Hotline PhoneFaxEmail Building Department Website Basic Code InfoIf you have roofing specific handouts, please email a PDF to mailto:debbie@coloradoroofing.org or enter the link address in the box: Code you currently use: (i.e. 2012 IRC/IBC, etc.) Please indicate any amendments.Will you be adopting a new code in the future?YesNoWhen?Current Energy Code (i.e. 2009, 2012, none)?Do you plan to adopt a new Energy Code in the future?YesNoWhich code and when?Do you require a roofing permit?YesNoAny other/special permits required? (i.e. decking, sheathing, separate structure, etc.)What Class Roof System/Fire Rating is required for Residential dwellings?Class AClass BClass CWhat Class Roof System/Fire Rating is required for Commercial buildings?Class AClass BClass CWhat Class Roof System/Fire Rating is required for Multi-Family?Class AClass BClass CPlease note any special conditions:Wind InfoMinimum designed wind speed rating:ASTM standard for wind rating:Comment:Do you require a manufacturer's wind warranty on steep slope roofing? If so, what is your required wind warranty?Do you require wind nailing (i.e. 6 nail, mansard, etc.)?YesNoDefine/Comment:Do your roofing inspectors carry ladders for the final?Yes with one story accessNoOther Comments?Is an inspection required - pre?YesNoIs an inspection required - mid?YesNoIs an inspection required - final?YesNoProvide Details/Other comments (i.e. At what point? Type of roof? etc.):Maximum number of layers of asphalt shingles permitted:One LayerTwo LayersComment (Commercial, Residential):Maximum number of layers of low slope material permitted:One LayerTwo LayersComment (Commercial, Residential):Decking InfoDo you require a sheathing/decking inspection?YesNoSpecial requirements:Is solid sheeting (plywood/OSB) required over spaced decking?YesNoWhat maximum gap size?Any gap at all1/4 inch gap3/8 inch gap1/2 inch gapComments/Other:Drip edge required?YesNoWhat is the drip edge size minimum1 x 22 x 22 x 4Comment/Other:Is Rake/Gable metal edging required?YesNoGable metal is installed in addition to drip edge and is used to protect the vertical fascia from rotting.Do you require the use of Ice Dam Protection Membrane (i.e. Ice & Water) at the eaves?YesNoHow far inside warm wall?24"36"Comment (i.e., walls, valleys, etc.):Underlayment InfoUnderlayment required 2:12 up to 4:1219" overlap of 15#19" overlap of 30#Self Adhering Underlayment (i.e. Ice & Water)4:12 and AboveOne layer 15#30#Comment:Type of valley allowed:OpenClosedBothComment:Valley Underlayment/Material Required for closed valleys:Self Adhering Underlayment (i.e. Ice & Water)Mineral SurfaceEitherComment:Valley Underlayment/Material Required for open valleys:Self Adhering Underlayment (i.e. Ice & Water) under metalMineral SurfaceEitherComment:Is Kick-out required on Step Flashing?YesNoDo you have a minimum curb height requirement?YesNoWhat height?First ChoiceSecond ChoiceThird ChoiceComments/other:Chimney/OtherWhen are chimney crickets required?24" or greater width30"or greater widthOther?Do you require crickets anywhere else? Explain:Is positive drainage required?YesNoComments (i.e., 1/8, 1/4):Is ventilation required to meet building codes?YesNoComments:Are soffit eave/vents permitted?YesYes - New construction onlyNoDo you allow rolled roofing (mineral surface) on low slope heating living space?YesNoNo non-heated space onlyComments?What slope?1:122:123:12Comment?Do you have any special Residential insulation code requirements?Do you have any special Commercial insulation code requirements?